Product Image

4K HDMI Cable 2.0 Ultra HD High Speed 1m/2m/3m/5m/7m/10m/15m/20m Metre Long Lead

£6.79

✔ Multiple lengths available: 1m, 2m, 3m, 5m, 7m, 10m, 15m & 20m. ✔ Supports 4K Ultra HD resolution. Available in multiple lengths from1m to 20m to suit any installation. ✔ HDMI 2.0 High-Speed performance.

This product would be ideal for professional audio-visual applications requiring clear and high-quality HD video transfer over a long cable distance.

Product Reviews

Name: Review: