Product Image

4K HDMI Cable 2.0 Ultra HD High Speed 1m/2m/3m/5m/7m/10m/15m/20m Metre Long Lead

£34.99

4K HDMI Cable (1m–30m) • HDMI 2.0 High Speed. ???? HDMI 2.0. HDMI Standard HDMI 2.0. Lengths 1m–30m (select your length from the dropdown). Connectors HDMI Type-A Male to Male. HDR • ARC • Gold Plated • Premium Build • 3 Year Warranty.

Product Reviews

Name: Review: