Site Logo
My Account | Wishlist | Basket
All Categories
DVI Cables
Ethernet Cables
FDD Cables
Fibre Optic Cables
Firewire Cables
HDMI Cables
IDE Cables
KVM Cables
Lightning Cables
Parallel Cables
Power Cables
PS/2 Cables
RGB Cables
SATA Cables
SCSI Cables
Serial Cables
USB Cables
VGA Cables
Latest Articles
Are More Expensive HDMI Cables Worth It?
  1. Home
Product Image

4K HDMI Cable Ultra HD High Speed 2.0 Long Lead 4m/5m/7m/10m/12m/15m/20m Metre

£19.99

Blue 4K HDMI Cable (0.25m–20m) • HDMI 2.0 High Speed. ???? 4K UHD (2160p). 4K Ultra HD (2160p) support for compatible devices. Lengths 0.25m–20m (select from variations). ???? HDMI 2.0. Connectors HDMI 2.0 Male to Male.

Product Reviews

Name: Review:

Related Products

Mygatti 10m 4K HDMI Cable,Ultra HD HDMI 2.0 Cable, Gold-Plated ​​Connectors,28AWG Pure Copper Conductors,4K@60Hz,2K,1080P,HDCP 2.2,for Laptop,Monitors,HDTV,PS5,Xbox and More

Mygatti 10m 4K HDMI Cable,Ultra HD HDMI 2.0 Cable, Gold-Plated ​​Connectors,28AWG Pure Copper Conductors,4K@60Hz,2K,1080P,HDCP 2.2,for Laptop,Monitors,HDTV,PS5,Xbox and More

£15.99

Primewire – HDMI Cabel 8k - 90° angled - 1m - 8 K @ 60 Hz with DSC - 7680 x 4320-3.3 Feet HDMI cable 2.0 2.1 – HDR - 4k HDMI cable – Ultra HD II - Dynamic HDR-10+ - VRR - Dolby Vision

Primewire – HDMI Cabel 8k - 90° angled - 1m - 8 K @ 60 Hz with DSC - 7680 x 4320-3.3 Feet HDMI cable 2.0 2.1 – HDR - 4k HDMI cable – Ultra HD II - Dynamic HDR-10+ - VRR - Dolby Vision

£8.99

Primewire – 2m 8k HDMI Cable - 90° angled - 8 K @ 60 Hz with DSC - 7680 x 4320 - HDMI 2.0 2.1 – HDR - 4k HDMI cable – Ultra HD II - Dynamic HDR-10+ - VRR - Dolby Vision - for PS5 PS4 Xbox Blu Ray

Primewire – 2m 8k HDMI Cable - 90° angled - 8 K @ 60 Hz with DSC - 7680 x 4320 - HDMI 2.0 2.1 – HDR - 4k HDMI cable – Ultra HD II - Dynamic HDR-10+ - VRR - Dolby Vision - for PS5 PS4 Xbox Blu Ray

£8.66

Akord 5 Metre 4K HDMI Cable Ultra High Speed HDMI Cable

Akord 5 Metre 4K HDMI Cable Ultra High Speed HDMI Cable

£3.31

Premium 3M Long 4K HDMI Cable Ultra HD 3D ARC TV PS5 Xbox Sky White

Premium 3M Long 4K HDMI Cable Ultra HD 3D ARC TV PS5 Xbox Sky White

£7.07

JuicEBitz 4K HDMI Cable 5M, Ultra High Speed HDMI 4k 18Gbps. 2.0 HDMI Lead with Ethernet, HDMI to HDMI Cable, Compatible with Xbox, Playstation, Apple TV, Sky + More. Ultra HD 5M Long HDMI

JuicEBitz 4K HDMI Cable 5M, Ultra High Speed HDMI 4k 18Gbps. 2.0 HDMI Lead with Ethernet, HDMI to HDMI Cable, Compatible with Xbox, Playstation, Apple TV, Sky + More. Ultra HD 5M Long HDMI

£19.99

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buyCables.co.uk 2026