This genuine Apple Thunderbolt 2 cable is 2m Long and looks in nice condition. It has light marks as it's white. A well looked after item.
OFFICIAL GENUINE APPLE THUNDERBOLT 2 CABLE 0.5M FOR IMAC/MACBOOK A1410 MD862ZM/A
Genuine Apple Thunderbolt 2 to FireWire 800 Adapter (A1463/MD464ZM/A)
Genuine Apple Thunderbolt 2 to FireWire 800 Adapter (A1463/EMC2591)
Genuine Apple Thunderbolt 2 To FireWire 800 Adapter - Tested And Working - A1463
Genuine Apple Thunderbolt 2 to FireWire 800 Adapter (A1463)