Site Logo
My Account | Wishlist | Basket
All Categories

Power Cables

Latest Articles
Are More Expensive HDMI Cables Worth It?
  1. Home
  2. Power Cables
Product Image

Iron Power Cable UNIVERSAL 2.5 Metre Long Lead Flex Cord & UK 3 Pin Plug

£9.99

All makes and models of steam iron, dry iron and steam generator iron using a standard 3 core cable. Oven Shelf Universal Adjustable Extendable Rack Shelves Spare 345 - 565mm x 2. UK Plug - 13 Amp / 250V (Certified to BS1363/A).

Product Reviews

Name: Review:

Related Products

SatelliteSale 18AWG 2-Prong to Round/Round Connector AC Universal Replacement Power Cable Universal Wire PVC Black Cord 6 feet

SatelliteSale 18AWG 2-Prong to Round/Round Connector AC Universal Replacement Power Cable Universal Wire PVC Black Cord 6 feet

£15

Mcbazel 1M 5V USB to DC Power Cable, Universal Replacement Charger Cord with 5 Connectors (5.5x2.5mm/4x1.7mm/3.5x1.35mm/3x1mm/2.5x0.7mm) Adapter, for Router, Mini Fan, Camera, Router, Mini Fan, Camera

Mcbazel 1M 5V USB to DC Power Cable, Universal Replacement Charger Cord with 5 Connectors (5.5x2.5mm/4x1.7mm/3.5x1.35mm/3x1mm/2.5x0.7mm) Adapter, for Router, Mini Fan, Camera, Router, Mini Fan, Camera

£4.80

2 Pin Mains Power Cable Universal Fig Figure 8 UK Lead Compatible with HP Envy 4500 5530 5532 120 OfficeJet 4650 6968 6978 3830 Canon PIXMA MG2520 MG3220 MG3222 MG3520 MG5420 Printer | 3 Pin Wall 1.8m

2 Pin Mains Power Cable Universal Fig Figure 8 UK Lead Compatible with HP Envy 4500 5530 5532 120 OfficeJet 4650 6968 6978 3830 Canon PIXMA MG2520 MG3220 MG3222 MG3520 MG5420 Printer | 3 Pin Wall 1.8m

£8.99

Iec 320 C14 To 3 X C13 Power Cable Universal 1 To 3 Iec 320 C14 Male To 3 X BAJ

Iec 320 C14 To 3 X C13 Power Cable Universal 1 To 3 Iec 320 C14 Male To 3 X BAJ

£12.97

Mr.Gadget's Solutions 3-Prong Power Cable – Universal Kettle Lead for TVs, Monitors, and Electronics – Heavy-Duty, Replacement Cable (3m)

Mr.Gadget's Solutions 3-Prong Power Cable – Universal Kettle Lead for TVs, Monitors, and Electronics – Heavy-Duty, Replacement Cable (3m)

£10.99

50cm Length XT60 To DC5525 Cable DC5525 Power Cable  Smart Soldering Iron

50cm Length XT60 To DC5525 Cable DC5525 Power Cable Smart Soldering Iron

£5.69

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buyCables.co.uk 2026